/
2.1.3.3 Add Actual Figures to the Project Versions
2.1.3.3 Add Actual Figures to the Project Versions
To add actual figures to a specific project version, you can either edit or copy an existing project version, as well as create a new project version. When doing so, following screen will appear:
Under actual data, you can then define for which time-period you want to show the actual figures. This can be either for the last uploaded ledger as well as for a specific date.
, multiple selections available,
Related content
2.1.3.5 Display of Actual Figures
2.1.3.5 Display of Actual Figures
More like this
2.1.3.6 Interaction Plan with Actual Figures
2.1.3.6 Interaction Plan with Actual Figures
More like this
Project Versions Table
Project Versions Table
More like this
2.2.2 Adding Projects to the Portfolio
2.2.2 Adding Projects to the Portfolio
More like this
2.1.3.2 Upload of Mapping Files
2.1.3.2 Upload of Mapping Files
More like this
2.2.4 Plan vs Actual
2.2.4 Plan vs Actual
More like this