2.1.1 Master

2.1.1 Master

Master

Master data include the most important project parameters. The Transaction Date (TRX) and Project Lifetime built the starting point of the time series calculations (financial model).

Edit

Input Field

Description

Unit

Influence

Presetting

Input Field

Description

Unit

Influence

Presetting

Project Name

Name of the current project. The name can also be changed here.

Free text

Descriptive

"Project"

Project Type

Layer function:

Real Project

Real project with real data

Test Project

Project entry for test purpose

Template

Template for reuse

Selection

Descriptive

Real Project

Tags

You can add several tags to each project. The different tags must be entered separated with a comma, for example: "Wind GmbH, Switzerland, KEV" for these tags "Wind GmbH", "Switzerland" and "KEV".

You can search for tags in the project overview.

Free text

Tags

-

Asset Class

Project Asset Class, without an influence on the calculation. (More Asset Classes on request. Please contact support@greenmatch.ch)

  • Energy

Selection

Descriptive

Energy

Country

Country of the project. The following countries are actually available, without an influence on the calculation.

Code

Country

BE

Belgium

BG

Bulgaria

DK

Denmark

DE

Germany

EE

Estonia

FI

Finland

FR

France

GR

Greece

IE

Ireland

IT

Italy

HR

Croatia

LV

Latvia

LT

Lithuania

LU

Luxembourg

MT

Malta

NL

Netherlands

NO

Norway

AT

Austria

PL

Poland

PT

Portugal

RO

Romania

SE

Sweden

CH

Switzerland

SK

Slovakia

SI

Slovenia

ES

Spain

CZ

Czech Republic

TR

Turkey

HU

Hungary

GB

United Kingdom

CY

Cyprus



Other

The individual country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further countries via support@greenmatch.ch.

Selection

Descriptive

Germany

Currency

The currency is defined globally for the whole project. The currency has only presentation purpose, without an influence on the calculation.The following currencies are actually available:

Code

Currency

EUR

Euro

USD

US Dollar

CHF

Swiss Franc

NOK

Norwegian Kroner

SEK

Swedish Krona

CZK

Czech Koruna

PLN

Polish Zloty

HRK

Croatian Kuna

BGN

Bulgarian Lev

RON

Romanian New Lei

GBP

British Pound

LTL

Lithuanian Litas

HUF

Hungarian Forint

DKK

Danish Kroner

The individual currency selection in touch with the country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further currencies via support@greenmatch.ch.

Selection

Unit labels

EUR

Unit

The selection of an unit allows a fitted presentation according to the project size, without an influence on the calculation. The selection can't be changed afterwards. The power and production of each production unit is shown in the selected unit. As driver unit there can be still selected a different unit.

kW

Kilowatt, for example for building integrated photo-voltaic sites

MW

Megawatt, for example for onshore wind sites

GW

Gigawatt, for example for offshore wind sites

Selection

Unit labels

MW

Transaction Status

With this drop-down the transaction status is selected:

Pre Evaluation

First vague evaluation of the Project

Attached Version NBO or LOI

The project state serves as basis for the purchase price estimation and connected with these price as non-binding offer for the seller (NBO: Non Binding Offer, LOI: Letter of Intent).

Due Diligence

In-depth analysis of the project, mostly in connection with external consultants and acute contract negotiations.

Attached Version Proposal

The project state serves as basis for the investment proposal, typically as draft for the decision-makers.

Signing / Closing

The project state is finally negotiated and serves normally as basis for the purchase price.

Portfolio Management

The project was already bought and will be re-evaluated at the transaction date.

Exit

The project is in a selling process (Exit).

Selection

Descriptive

Pre Evaluation

Default Version

Selection of the Projectversion which is shown as default when a Project is opened.

%

 

0