Losses
Losses
Losses
With the help of Losses individual Production corrections of each Production Unit are possible. There are different Loss modes (Loss, Efficiency and Degradation) available.
The Losses are converted to an Efficiency before reimbursement with Potential P50 respective Production and then multiplicative converted to a time series dependent total loss. For example: Loss 1 = 2% and Loss 2 = 1% yield to a total Loss of 99% x 98% = 97.02%.
Name | Description | Unit | Influence | Presetting | ||||||
---|---|---|---|---|---|---|---|---|---|---|
Loss Name | Name of the loss. | Free text | Descriptive | "Loss" | ||||||
Mode |
| Selection | Production | Loss | ||||||
Value | Value which depends on the mode. | percent per year | Production | 0% | ||||||
Start | Start of the loss is entered with a Date choice box. For example: "for the first time at production start", that is Production Start + 0 months. | Date choice box | Time series | Facility Start + 0 months | ||||||
End | End of the loss is entered with a Date choice box. For example: "for the last time at production end", that is Production End + 0 months. | Date choice box | Time series | Facility Start + 0 months | ||||||
Facilities | Selection of the concerned production unit. The presetting is that all production units are concerned. With a change to "Some" you can choose individual production units. | Facility allocation | Production | All |
Calculation
The losses affect the Production calculation.
, multiple selections available,
Related content
Production Units
Production Units
More like this
2.1.2.4 Production
2.1.2.4 Production
More like this
Loss calculations
Loss calculations
More like this
Production Amount
Production Amount
More like this
Sales calculations
Sales calculations
More like this
Operating Performance Indicators
Operating Performance Indicators
More like this