Operating Performance Indicators
Operating Performance Indicators
This section shows an overview to evaluate the Production of the current Project.
Initial (MWh/a) | Full-load Hours (h/a) | Capacity Factor (%) | ā (MWh) | |
---|---|---|---|---|
Potential P50 Potential Reference Value Production Reference Value | The Potential respective the Production in MWh/a for the different cases. | Full-load Hours are a measure of utilization for technical facilities. A wind turbine with installed Power of 3 MW produces 7'000 MWh electricity. The maximum Full-load Hours are then 7'000 MWh / 3 MW = 2'333 h/a. The generated energy corresponds to the energy the wind turbine would generate if it would produces these 2'333 h/a with maximal Power and the rest of time it would produce nothing. In reality, the facility will produces with reduced Power, but over more hours. Full-load Hours are shown in hours per year (h/a). | The Capacity Factor shows how many hours the Production Unit has to work on Full-load. The Capacity Factor is shown in percentage as number of operating hours from number of hours per year. | The produced energy over the whole Project Lifetime in MWh. |
ā ("Currency") | Per Total Power ("Currency"/MW) | Per Total Production ("Currency"/MWh) | Per Total Sales (%) | |
---|---|---|---|---|
Accumulated Opex | Sum of all Opex entities over the Project Lifetime. | Costs of all Opex entities per installed Power in MW. | Costs of all Opex entities per produced Unit in MWh. | Opex in percentage of all Sales over the whole Project Lifetime |
Individual Opex Entities | Costs of individual Opex entities over the Project Lifetime. | Costs of individual Opex entities per installed Power in MW. | Costs of individual Opex entities per produced Unit in MWh. | Individual Opex in percentage of all Sales over the whole Project Lifetime |