Master

Master data include the most important project parameters. The Transaction Date (TRX) and Project Lifetime built the starting point of the time series calculations (financial model).

Edit

Input FieldDescriptionUnitInfluencePresetting

Project Name

Name of the current project. The name can also be changed here.

Free textDescriptive"Project"

Project Type

Layer function:

Real ProjectReal project with real data
Test ProjectProject entry for test purpose
TemplateTemplate for reuse
SelectionDescriptiveReal Project

Tags

You can add several tags to each project. The different tags must be entered separated with a comma, for example: "Wind GmbH, Switzerland, KEV" for these tags "Wind GmbH", "Switzerland" and "KEV".

You can search for tags in the project overview.

Free textTags-

Technology

Project Technology, without an influence on the calculation. According to the licence agreement in the asset class "Renewable-Energy Power Plant":

WindWind turbine
PhotovoltaicsPhotovoltaic site
HydroHydro site
BiomassBiomass or Biogas site
SelectionDescriptiveWind

Sub-Technology

Selection of the sub-technology, without an influence on the calculation.

Wind
  • Onshore
  • Offshore
Photovoltaics
  • Building Integrated
  • Free-Standing
Hydro
  • Small Hydro Power Plant
  • River Power Plant
  • Storage Power Plant
Biomass
  • Thermal
  • Biochemical
SelectionDescriptive

Onshore or
Building Integrated or
Small Hydro Power Plant or
Thermal 



 

Country

Country of the project. The following countries are actually available, without an influence on the calculation.

CodeCountry
BEBelgium
BGBulgaria
DKDenmark
DEGermany
EEEstonia
FIFinland
FRFrance
GRGreece
IEIreland
ITItaly
HRCroatia
LVLatvia
LTLithuania
LULuxembourg
MTMalta
NLNetherlands
NONorway
ATAustria
PLPoland
PTPortugal
RORomania
SESweden
CHSwitzerland
SKSlovakia
SISlovenia
ESSpain
CZCzech Republic
TRTurkey
HUHungary
GBUnited Kingdom
CYCyprus

Other

The individual country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further countries via support@greenmatch.ch.

SelectionDescriptiveGermany

Currency

The currency is defined globally for the whole project. The currency has only presentation purpose, without an influence on the calculation.The following currencies are actually available:

CodeCurrency
EUREuro
USDUS Dollar
CHFSwiss Franc
NOKNorwegian Kroner
SEKSwedish Krona
CZKCzech Koruna
PLNPolish Zloty
HRKCroatian Kuna
BGNBulgarian Lev
RONRomanian New Lei
GBPBritish Pound
LTLLithuanian Litas
HUFHungarian Forint
DKKDanish Kroner

The individual currency selection in touch with the country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further currencies via support@greenmatch.ch.

SelectionUnit labelsEUR

Unit

The selection of an unit allows a fitted presentation according to the project size, without an influence on the calculation. The selection can't be changed afterwards. The power and production of each production unit is shown in the selected unit. As driver unit there can be still selected a different unit.

kWKilowatt, for example for building integrated photo-voltaic sites
MWMegawatt, for example for onshore wind sites
GWGigawatt, for example for offshore wind sites
SelectionUnit labelsMW

Transaction Status

With this drop-down the transaction status is selected:

Pre EvaluationFirst vague evaluation of the Project
Attached Version NBO or LOIThe project state serves as basis for the purchase price estimation and connected with these price as non-binding offer for the seller (NBO: Non Binding Offer, LOI: Letter of Intent).
Due DiligenceIn-depth analysis of the project, mostly in connection with external consultants and acute contract negotiations.
Attached Version ProposalThe project state serves as basis for the investment proposal, typically as draft for the decision-makers.
Signing / ClosingThe project state is finally negotiated and serves normally as basis for the purchase price.
Portfolio ManagementThe project was already bought and will be re-evaluated at the transaction date.
ExitThe project is in a selling process (Exit).
SelectionDescriptivePre Evaluation

Default Version

Selection of the Projectversion which is shown as default when a Project is opened.

%
0

Copy Project

Input FieldDescriptionUnitInfluencePresetting

Project Name

Name of the new project copy.

Free textDescriptiveName of the original Project

Export Project

Click on "Download as JSON" to download a .json file of the current project.

Delete Project

Confirm with a click on "Delete".