Inputs
- Production Units
- Start
- Power
- Potential P50
- Production (Input)
- P-Value
- Standard Deviation
- Losses
- Mode
- Value
- Start
- End
- Facilities
- Monthly Distribution
- Production Units
Calculations
Production |
|
---|
Key Data
Calculation | Unit | |
---|---|---|
Full-load Hours | Full-load Hours = Production amount per year / Power | h/a |
Potential PN | Potential PN = Potential P50 x (1 - Confidence) | MWh/a |
Production PN | Production PN = Potential PN x Efficiency | MWh/a |
Efficiency | Efficiency = 100% x (1 - Lossesi) x Efficiency x (1-Degradation)t For the Loss mode "Degradation" the average value over the Project Lifetime is shown. | % |