Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

English

Table of Contents

Info
titleMaster

Master data include the most important project parameters. The Transaction Date (TRX) and Project Lifetime

...

built the starting

...

point of the time

...

series calculations (

...

financial model).

Edit

Input

...

FieldDescriptionUnitInfluencePresetting

Project Name

Name of the current project. The name can also be changed here.

...

Free text

...

Descriptive"Project"

Project Type

Layer function:

Real ProjectReal project with real data
Test ProjectProject entry for test purpose
Template

...

Template for reuse

...


Selection

...

Descriptive

...

Real Project

Tags

You can add several tags to each project. The different tags must be entered

...

separated with a comma, for example: "Wind GmbH, Switzerland, KEV" for these tags "Wind GmbH", "

...

Switzerland" and "KEV".

You can search for tags in the project overview.

...

Free text

...

Tags-

Technology

Project Technology, without an influence on the calculation. According to the licence agreement

...

in the asset class "Renewable-Energy Power Plant":

WindWind turbine
Photovoltaics

...

Photovoltaic site
HydroHydro site
BiomassBiomass or Biogas site

...


Selection

...

DescriptiveWind

Sub-Technology

Selection of the sub-technology, without an influence on the calculation.

Wind
  • Onshore
  • Offshore

...

Photovoltaics
  • Building Integrated
  • Free-Standing

...

Hydro
  • Small Hydro Power Plant
  • River Power Plant
  • Storage Power Plant

...

Biomass
  • Thermal
  • Biochemical

...


Selection

...

Descriptive

Onshore

...

or
Building Integrated or
Small Hydro Power Plant or
Thermal 



 

Country

...

Country of the project. The following countries are actually available, without an influence on the calculation.

Code

...

Country

...

BE

...

Belgium
BG

...

Bulgaria
DK

...

Denmark
DE

...

Germany
EE

...

Estonia
FI

...

Finland
FR

...

France
GR

...

Greece
IE

...

Ireland
IT

...

Italy
HR

...

Croatia
LV

...

Latvia
LT

...

Lithuania
LU

...

Luxembourg
MTMalta

...

NL

...

Netherlands

...

NO

...

Norway
AT

...

Austria
PL

...

Poland
PTPortugal

...

RO

...

Romania
SE

...

Sweden
CH

...

Switzerland
SK

...

Slovakia
SI

...

Slovenia
ES

...

Spain
CZ

...

Czech Republic
TR

...

Turkey
HU

...

Hungary
GB

...

United Kingdom
CY

...

Cyprus

...

...

Es gilt die individuelle Länderauswahl gemäss lizenziertem Lizenzumfang. Für Lizenznehmer der Kategorie "Europa (generisch)" können weitere Länder bei support@greenmatch.ch angefragt werden.


Other

The individual country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further countries via support@greenmatch.ch.

SelectionDescriptiveGermany

Anchor
Curr
Curr
Currency

...

The currency is defined globally for the whole project. The currency has only presentation purpose, without an influence on the calculation.The following currencies are actually available:

Code

...

Currency
EUR

...

Euro
USDUS Dollar

...

CHF

...

Swiss Franc
NOK

...

Norwegian Kroner
SEK

...

Swedish Krona
CZK

...

Czech Koruna
PLN

...

Polish Zloty
HRK

...

Croatian Kuna
BGN

...

Bulgarian Lev
RON

...

Romanian New Lei
GBP

...

British Pound
LTL

...

Lithuanian Litas
HUF

...

Hungarian Forint
DKK

...

Danish Kroner

Es gilt die individuelle Währungsauswahl in Verbindung mit der Länderauswahl gemäss lizenziertem Lizenzumfang. Für Lizenznehmer der Kategorie "Europa (generisch)" können weitere Währungen bei support@greenmatch.ch angefragt werden.

The individual currency selection in touch with the country selection according to the licence agreement is valid. Licence holder of the category "Europe (generic)" can request further currencies via support@greenmatch.ch.

SelectionUnit labelsEUR

Anchor
Unit
Unit
Unit

...

The selection of an unit allows a fitted presentation according to the project size, without an influence on the calculation. The selection can't be changed afterwards. The power and production of each production unit is shown in the selected unit. As driver unit there can be still selected a different unit.

kWKilowatt,

...

for example for building integrated photo-voltaic sites
MWMegawatt,

...

for example for onshore wind sites
GWGigawatt,

...

for example for offshore wind sites


SelectionUnit labelsMW

...

Zeitpunkt der Transaktion. Das Transaktionsdatum kann auf den Monat genau eingegeben werden. Abkürzung: "TRX" oder "Transaktion"

Der Eingabemonat bezieht sich auf den ersten Tag dieses Monats (inklusiv) bzw. den letzten Tag des Vormonats (exklusiv). Beispiel: Ein Transaktionsdatum 01 / 2015 bedeutet, dass die Bilanz per Stichtag 31.12.2014 übernommen wird (exklusiv) bzw. ab 01.01.2014 dem kaufenden Transaktionspartner gehört (inklusiv).

Das Finanzmodell und damit verbundene Kennzahlen (bspw. IRR-Berechnung, Summenbildung) startet jeweils mit dem Transaktionsdatum. Es gibt aber zahlreiche Berechnungen (bspw. Start Produktion, Auszahlung Investitionen, Auszahlung Fremdkapital, u.a.), welche dennoch vor dem eingegebenen Transaktionsdatum starten können und darauf bezogen berechnet werden (vgl. Wert zum Transaktionszeitpunkt).

...

Die technische Lebensdauer der Anlagen wird in Anzahl Jahren angegeben. Die Anlage produziert vom Inbetriebnahmedatum weg genau die angegebene Anzahl Jahre.

Ist die Inbetriebnahme beispielsweise am 01.02.2013 und die Lebensdauer 20 Jahre, produziert die Anlage bis und mit 31.01.2033.

...

Transaction Status

In diesem Dropdown wird der Transaktionsstatus angegeben.

...

Die technische Lebensdauer der Anlagen wird in Anzahl Jahren angegeben. Die Anlage produziert vom Inbetriebnahmedatum weg genau die angegebene Anzahl Jahre.

Ist die Inbetriebnahme beispielsweise am 01.02.2013 und die Lebensdauer 20 Jahre, produziert die Anlage bis und mit 31.01.2033.

...

Transaktionsstatus

...

In diesem Dropdown wird der Transaktionsstatus angegeben.

Pre EvaluationGrobe Vor-Analyse des Projektes
Beigelegte Version NBO oder LOIDer Projekt-Zustand dient als Grundlage für die Kaufpreisschätzung und die damit verbundene unverbindliche Offerte an den Verkäufer (NBO: Non Binding Offer, LOI: Letter of Intent)
Due DiligenceVertiefte Analyse des Projektes, meistens in Verbindung mit externen Beratern und intensiven Vertragsverhandlungen.
Beigelegte Version ProposalDer Projekt-Zustand dient als Grundlage für den Investitionsantrag (Investment Proposal), typischerweise zur Vorlage an die Entscheidungsträger.
Signing / ClosingDer Projekt-Zustand ist final verhandelt, entschieden und dient in der Regel als Grundlage für die Kaufpreiszahlung.
Portfolio ManagementDas Projekt wurde bereits gekauft und wird auf den Transaktionszeitpunkt bezogen neu bewertet.
ExitDas Projekt befindet sich in einem Verkaufsprozess (Exit).

...

Standard Inflation

...

Eingabe eines Inflationswertes für das Anlegen einer Standard Indexierung (siehe Indexierungen)

...

Transaction Status

With this drop-down the transaction status is selected:

Pre EvaluationFirst vague evaluation of the Project
Attached Version NBO or LOIThe project state serves as basis for the purchase price estimation and connected with these price as non-binding offer for the seller (NBO: Non Binding Offer, LOI: Letter of Intent).
Due Diligence

...

Default Inflation

...

Eingabe eines Inflationswertes für das Anlegen einer Standard Indexierung (siehe Indexierungen)

...

Table of Contents

Info
titleProjektstammdaten

Projektstammdaten dienen der Grundeinstellung von wichtigen Projektparametern. Das Transaktionsdatum (TRX) und die Projektlaufzeit bilden die Ausgangslage für die Zeitreihenberechnungen (Finanzmodell).

...

Projektname

...

Name des zu untersuchenden Projektes. Der Name des Projektes kann geändert werden.

...

Projekttyp

...

Unterscheidungsfilter für das Projekt:

Reales ProjektEchtes Projekt mit realen Daten
TestprojektProjekterfassung für Testzwecke
ProjektvorlageVorlage für Wiederverwendung

...

Etiketten

...

Dem Projekt können verschiedenen Etiketten respektive Tags hinzugefügt werden. Die verschiedenen Etiketten müssen getrennt durch ein Komma eingegeben werden, beispielsweise: "Wind GmbH, Schweiz, KEV" für die Etiketten "Wind GmbH", "Schweiz" und "KEV".

In der Projektübersicht kann nach einzelnen Etiketten gesucht werden.

...

Technologie

...

Technologie des Projektes, ohne Einfluss auf die Berechnung. Gemäss Lizenzumfang in der Asset Klasse "Erneuerbare-Energie-Kraftwerke":

WindWindkraft-Anlage
PhotovoltaikPhotovoltaik-Anlage
WasserkraftWasserkraft-Anlage
BiomasseBiomasse- oder Biogas-Anlage

...

Sub-Technologie

...

Auswahl der Sub-Technologie des Projektes, ohne Einfluss auf die Berechnung.

Wind
  • Onshore
  • Offshore
Photovoltaik
  • Dachanlage
  • Freiland
Wasserkraft
  • Kleinstwasserkraftwerk
  • Laufwasserkraftwerk
  • Speicherwasserkraftwerk
Biomasse
  • Thermisch
  • Bio-Chemisch

...

Land

...

Land des Projektes. Aktuell stehen folgende Länder zur Auswahl, ohne Einfluss auf die Berechnung (generische Eingabe).

CodeDeutschEnglisch
BEBelgienBelgium
BGBulgarienBulgaria
DKDänemarkDenmark
DEDeutschlandGermany
EEEstlandEstonia
FIFinnlandFinland
FRFrankreichFrance
GRGriechenlandGreece
IEIrlandIreland
ITItalienItaly
HRKroatienCroatia
LVLettlandLatvia
LTLitauenLithuania
LULuxemburgLuxembourg
MTMaltaMalta
NLNiederlandeNetherlands
ATÖsterreichAustria
PLPolenPoland
PTPortugalPortugal
RORumänienRomania
SESchwedenSweden
CHSchweizSwitzerland
SKSlowakeiSlovakia
SISlowenienSlovenia
ESSpanienSpain
CZTschechienCzech Republic
TRTürkeiTurkey
HUUngarnHungary
GBVereinigtes KönigreichUnited Kingdom
CYZypernCyprus
 AndereOther

Es gilt die individuelle Länderauswahl gemäss lizenziertem Lizenzumfang. Für Lizenznehmer der Kategorie "Europa (generisch)" können weitere Länder bei support@greenmatch.ch angefragt werden.

...

Die Währung kann global für das ganze Projekt festgelegt werden. Die Währung dient reinen Darstellungszwecken ohne Einfluss auf die Berechnung. Aktuell stehen folgende Währungen zur Auswahl:

CodeDeutschEnglisch
EUREuroEuro
USDUS DollarUS Dollar
CHFSchweizer FrankenSwiss Franc
NOKNorwegische KroneNorwegian Kroner
SEKSchwedische KroneSwedish Krona
CZKTschechische KroneCzech Koruna
PLNPolnischer Zloty Polish Zloty
HRKKroatische KunaCroatian Kuna
BGNBulgarischer LewBulgarian Lev
RONRumänischer Neuer LeiRomanian New Lei
GBPBritisches PfundBritish Pound
LTLLitauische LitasLithuanian Litas
HUFUngarischer ForintHungarian Forint
DKKDänische KroneDanish Kroner

Es gilt die individuelle Währungsauswahl in Verbindung mit der Länderauswahl gemäss lizenziertem Lizenzumfang. Für Lizenznehmer der Kategorie "Europa (generisch)" können weitere Währungen bei support@greenmatch.ch angefragt werden.

...

Die Auswahl einer Einheit erlaubt eine an die Grösse des Projektes angepasste Darstellung von Einheiten ohne Einfluss auf die Berechnung. Dies Auswahl kann im Nachhinein nicht mehr angepasst werden. Die Leistung und die Produktion der Produktivanlagen werden in dieser Einheit angezeigt. Es kann jedoch weiterhin als Treiber eine andere Einheit ausgewählt werden.

kWKilowatt, bspw. für Dachanlagen Photovoltaik
MWMegawatt, bspw. für Onshore Wind
GWGigawatt, bspw. für Offshore Wind

...

Zeitpunkt der Transaktion. Das Transaktionsdatum kann auf den Monat genau eingegeben werden. Abkürzung: "TRX" oder "Transaktion"

Der Eingabemonat bezieht sich auf den ersten Tag dieses Monats (inklusiv) bzw. den letzten Tag des Vormonats (exklusiv). Beispiel: Ein Transaktionsdatum 01 / 2015 bedeutet, dass die Bilanz per Stichtag 31.12.2014 übernommen wird (exklusiv) bzw. ab 01.01.2014 dem kaufenden Transaktionspartner gehört (inklusiv).

Das Finanzmodell und damit verbundene Kennzahlen (bspw. IRR-Berechnung, Summenbildung) startet jeweils mit dem Transaktionsdatum. Es gibt aber zahlreiche Berechnungen (bspw. Start Produktion, Auszahlung Investitionen, Auszahlung Fremdkapital, u.a.), welche dennoch vor dem eingegebenen Transaktionsdatum starten können und darauf bezogen berechnet werden (vgl. Wert zum Transaktionszeitpunkt).

...

In-depth analysis of the project, mostly in connection with external consultants and acute contract negotiations.
Attached Version ProposalThe project state serves as basis for the investment proposal, typically as draft for the decision-makers.
Signing / ClosingThe project state is finally negotiated and serves normally as basis for the purchase price.
Portfolio ManagementThe project was already bought and will be re-evaluated at the transaction date.
ExitThe project is in a selling process (Exit).


SelectionDescriptivePre Evaluation

Default Version

Selection of the Projectversion which is shown as default when a Project is opened.

%
0

Copy Project

Input FieldDescriptionUnitInfluencePresetting

Project Name

Name of the new project copy.

Free textDescriptiveName of the original Project

Export Project

Click on "Download as JSON" to download a .json file of the current project.

Delete Project

Confirm with a click on "Delete".