Table of Contents |
---|
Info | ||
---|---|---|
| ||
The sites respective the productions units include all relevant input information for the energy production per unit. As long as the input data considering the start date of the production and the potential is homogeneous, the following examples apply as production unit:
|
Name | Description | Unit | Influence | Presetting | ||||||
---|---|---|---|---|---|---|---|---|---|---|
Production Unit Name | The production unit name. | Free text | Descriptive | "Production Unit" + Index | ||||||
| The production unit commissioning date. The start date input is to a month precise. The entered month refers to the first day of this month (inclusive). For example: Start date 01 / 2015 means the site starts producing on the 01.01.2015. | Month and year | Time series | actual month and year | ||||||
End Date | End date of the Production defined through a Date Choice Box. For example: "Production Unit Start + 20 years", what means the Production Units produces for 20 years. | Month and year | Time series | 0 years | ||||||
Production Unit State (Output) | Under Construction, if transaction date < production start date | - | - | - | ||||||
| Installed power of the production unit. | Selection:
| Full-load Hours | 0 MW | ||||||
| Long-term average energy production before losses and in P50 scenario (resp. before Safety Reduction). The potential is normally from a production assessment. For wind parks there is often a value after park losses which is used. In this case there are no separate losses from shadings. | Selection:
| Production | 0 MWh/a | ||||||
Full-load Hours (Potential P50) | Full-load Hour are a calculated size. Full-load Hours = Production amount per year / Power | h/a | - | - | ||||||
Material (Technology = Biomass) | Biomass input or output of the project, for example wood chip or fertilizer. The entered values can be used as driver in the Sales and Opex section. If a biomass site needs for example 1'000 t/a input material, this value can be charged in the Opex section with the driver "Material" for 10 EUR/t for example. If a biomass site produces for example 200 t/a fertilizer as side product, this output can be remunerated with the driver "Material" for 50 EUR/t for example.
| Selection:
| Production | 0 t/a |
Calculation
Production Units affect the Production calculation.