Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

English

(Project, Equity and Payout)
NPV
DSCR

DSCR = internal financed components of the operative Cashflow(t) / Debt Service referred to the Look Back Period

Full-load Hours

Full-load Hours = Production Amount per year / Power

Capacity Factor

Capacity Factor = Full-load Hours / ha

with ha = hours per year (8760 h)

Sum Production AmountSum Production Amount = Production Amount x Project Lifetime
LCOE

t=0: Valuation Date

t=T: Project end

German
IRR
(Projekt-, Eigenkapital- und Payoutrendite)

 

NPV
DSCR

DSCR = intern finanzierte Komponenten des operativen Cashflows(t) / Schuldendienst gemäss Rückschaufenster

Volllaststunden

Volllaststunden = Produktionsmenge pro Jahr / Leistung

Kapazitätsfaktor

Kapazitätsfaktor = Volllaststunden / ha

mit ha = Stunden pro Jahr (8760 h)

Summe ProduktionsmengeSumme Produktionsmenge = Produktionsmenge x Projektlaufzeit
LCOE

 

 

t=0: Bewertungszeitpunkt

t=T: Projektende